Trailing Suction Pipe TSP500

500

20

3550

1000

A Trailing Suction Pipe system is key to efficient hopper loading. The dredge pipe, hoisted over board using dedicated gantries and winches, is customised to be integrated in your hopper dredger seamlessly. The tailor-made dredge package ensures a complete delivery, whereas the shipyard can focus on the vessel itself. Our technical support ensures a perfect match. Our first-class dredging components are built to last, thus maximising uptime and minimising maintenance duties. Their proven concept ensures a fit-for-purpose design, in keeping with the wear and tear of the harsh dredging environment.

Available options:
Dredge valves
Dredge pumps
Overflows
Jet water monitors
Dredging instrumentation

Specifications

Key figures

Dimensions

Dredge pipe diameter
500 m
Dredge pump
BP5045LD
Max wave height
2 m

Capacities

Pump capacity
3550 m³/h
Hopper capacity
1000 m³
Loading time
20 minutes

Dredging depth

Minimum depth
- 7.5 m
Average depth
- 20 m
Maximum depth
- 35 m

Damen solutions

Lifecycle supportFrom delivery onwards, Damen Services supports you, every step of the way.Learn more
Build your vessel locallyBuild a proven Damen design, at a location of your choice.Learn more
Trade-in your current vesselExplore our options for vessel trade-in at Damen Trading. Our in-house shipbroker.Learn more
Transform your TSHD

Dredging solutions

Dredging equipment which will boost your dredger’s operation.

Let us tailor your equipment package

Together we will work out your perfect dredge package.