Booster Station BS350
Booster Station BS350
Dredged material can be pumped over long discharge distances without a problem. A remote-controlled sand pumping station in the pipeline does the trick. Sand mining operations of for instance cutter suction dredgers can be boosted, delivering the dredged material through a long dredge pipeline effortlessly.
- Remote control
- Fuel tank
- Electrically powered version
- Floating platform
- Fast mobilisation
- Large access hatches
- Practical transport
- Constant power over large speed range
Key figures
350
450
2000
13.5
7.25
Transport dimensions
- Overall length
- 7.25 m
- Overall width
- 2 m
- Overall height
- 2.65 m
- Weight
- 13.5 t
Engine installation
- Dredge pump diesel
- Volvo TAD 1643 VE-B
- Max power rating
- 450 kW @ 1,850 rpm
- Regulation
- IMO tier II
Dredge installation
- Dredge production
- 2000 m³/h
- Dredge pipe diameter
- 350 mm
- Dredge pump
- Damen BP3530MD
- Impeller diameter
- 860 mm
Do you want to know more?
Compare similar Booster Stations
Pipe diameter (mm) | Power (kW) | Production (m³/h) | Weight (t) | Overall length (m) | ||
---|---|---|---|---|---|---|
Booster Station BS350 | 350 | 450 | 2000 | 13.5 | 7.25 | |
Booster Station BS250 | 250 | 285 | 1000 | 8 | 5.53 | |
Booster Station BS450 | 450 | 709 | 3000 | 24 | 9.13 |
Booster Station BS350
- Pipe diameter (mm)
- 350
- Power (kW)
- 450
- Production (m³/h)
- 2000
- Weight (t)
- 13.5
- Overall length (m)
- 7.25
- Pipe diameter (mm)
- 250
- Power (kW)
- 285
- Production (m³/h)
- 1000
- Weight (t)
- 8
- Overall length (m)
- 5.53
- Pipe diameter (mm)
- 450
- Power (kW)
- 709
- Production (m³/h)
- 3000
- Weight (t)
- 24
- Overall length (m)
- 9.13
Damen solutions
Finance your vesselA reliable partner from start to finish. Explore solutions of Damen Financial Services.Learn more
Lifecycle supportFrom delivery onwards, Damen Services supports you, every step of the way.Learn more
The complete dredge package
Dredging solutions
1 / 6
Dredging news & insights
12 Feb 2025
Damen delivers comprehensive dredge package to Guyana
2 Oct 2024
Damen delivers Booster Station with Marine NOX Emission Reduction System to Hegemann
27 Oct 2021
Vale Verde orders second CSD based on trust
31 May 2021